< back | table of contents | next > |
Guest head was made handicap accessible which involved moving the door and turning the toilet in addition to new fixtures.
Before | After |
|
|
Demolition and Men's Head pipes in the ceiling:
New wall framed...and wired:
Moving the wall to accomodate the bath tub:
Removed window ledge:
Framing and new plumbing:
Wallboarding and skim coating:
Door:
Tub installed:
Flooring:
Door casing:
Bringing it on-line:
< back | table of contents | next > |